info
info
Work - 
SP/INF_03
All work
All work
Stellenbosch Water Plant
Play Video

Stellenbosch Water Plant

SP/INF_03
Year
2017
Location
STELLENBOSCH
Collaborations
ZUTARI
About

The design for the plant is a backdrop to the advanced membrane water filtration technology being used for water treatment. This renewable and more sustainable way of treating water requires advanced expertise to manage the processes on site. Collaboration between engineers, architects and consultants was not only necessary – it also strengthened our long-standing alliance with Zutari.

The project won an AON Engineering Excellence Award for ‘Projects between R250 Million to R1 Billion’ in 2020. A testament to its lucrative design, the Stellenbosch WWTW building became a template for future WWTW buildings across the city of Cape Town.

Read more
Read more
close
close

Stellenbosch Water Plant

Stellenbosch Water Plant

SP/INF_03
Year
2017
Location
STELLENBOSCH
Collaborations
ZUTARI

The design for the plant is a backdrop to the advanced membrane water filtration technology being used for water treatment. This renewable and more sustainable way of treating water requires advanced expertise to manage the processes on site. Collaboration between engineers, architects and consultants was not only necessary – it also strengthened our long-standing alliance with Zutari.

The project won an AON Engineering Excellence Award for ‘Projects between R250 Million to R1 Billion’ in 2020. A testament to its lucrative design, the Stellenbosch WWTW building became a template for future WWTW buildings across the city of Cape Town.

Close
Close
All Case Studies
All Case Studies
Creative Intelligence
00%